Description
The Reliance Pressure and Temperature Relief Valve has been designed to provide protection against over pressurization, which can occur within an Unvented Hot Water system if the input temperature controls fail. The valve is designed to be fitted in the upper portion of the cylinder as this is where the hottest system temperatures will be found. If the system temperature rises beyond 95°C, the wax mixture within the element of the temperature probe will expand, causing the valve to lift off its seat and relieve water to waste. If the water pressure increases (without temperature increase) the valve will stay closed until the set pressure of the relief mechanism is reached, at which point the valve will open to relieve the excess pressure build-up.
Delivery
We deliver all around the UK using DHL and Parcelforce. Standard delivery will take 1-5 working days to reach you. However, once the order is received, we will contact you to give you a more precise timescale. Usually, we will deliver the next day, subject to the date and time of when the order is received and the product.
Orders placed during the weekend will be processed the following Monday for delivery the following day. In the case of Bank Holidays, your order will be processed the next working day and delivered the following working day.
Remote areas: For orders to some addresses, especially in the Highlands of Scotland and Offshore, next day delivery options are not available, and delivery can take several days. Saturday delivery is unavailable for these areas.